Clogged Line
Last week the crew finished replacing 3 drain lines on 13 fwy.  The drain lines that were replaced were original lines, and no longer functional.  Sections of the lines were crushed, filled with soil and had roots growing through them.  With all the rain in August it was very evident that we had some issues on this fairway. 
This is a very labor intensive process to remove and replace the drainage lines.  We had most of the crew working on this job after morning assignments were finished.  This will be a huge improvement and will drain much faster and be much more firm.